What is the total estimated capital expenditure for the 669 MW Lower Arun Hydro Electric Project, and what is the approved debt-to-equity funding structure disclosed in the company's project feasibility filings?
The approved total project completion cost for SJVN’s 669 MW Lower Arun Hydro Electric Project is ₹7,505.24 Cr, approved on 12 August 2025.[1]
The project feasibility/bidding documentation specifies a 70:30 debt-to-equity funding structure.[2]
†Derived from the approved project cost and the disclosed 70:30 ratio.
An earlier Cabinet approval had cited ₹5,792.36 Cr as the cost to completion in August 2024.[3] The ₹7,505.24 Cr figure therefore appears to represent the later approved/revised project cost, while the funding structure remained 70:30.
| Funding source | Share | Implied amount on ₹7,505.24 Cr† |
|---|---|---|
| Debt | 70% | ₹5,253.67 Cr |
| Equity | 30% | ₹2,251.57 Cr |
How does the projected tariff structure and return on equity (RoE) profile for the 669 MW Lower Arun project compare to the company's existing cross-border asset, the 900 MW Arun-3 project, based on the financial assumptions provided in the project feasibility disclosures?
The cited disclosures support a tariff comparison for Lower Arun, but not a quantified RoE comparison with Arun-3. Lower Arun’s latest disclosed assumptions imply a higher tariff than its earlier approval benchmark, while project-level RoE for either asset—and Arun-3’s tariff in the cited material—could not be confirmed.
Lower Arun is planned downstream of Arun-3 and is intended to operate in tandem with it; its annual generation is estimated at approximately 2,901 MU in a 90% dependable year [1]. The tender documentation separately refers to a 70:30 debt-equity structure [2], but that is a financing assumption—not a reported RoE—and it cannot by itself establish returns.
Implication: Lower Arun’s disclosed economics show a revised, higher tariff framework relative to its earlier approval, with the levelized tariff below the first-year tariff. However, the material supplied does not establish whether Lower Arun’s RoE is superior or inferior to Arun-3’s. That conclusion requires the corresponding Arun-3 tariff, project equity, financing, generation, and return assumptions from the feasibility disclosures.
| Metric | Lower Arun, 669 MW | Arun-3, 900 MW | Analytical read |
|---|---|---|---|
| Tariff | First-year: ₹5.84/unit; levelized: ₹5.69/unit [1] | Could not be confirmed from the cited feasibility disclosures | Lower Arun’s first-year tariff is ₹0.15/unit, or approximately 2.6%, above its levelized tariff; this indicates some front-loading of tariff recovery. |
| Earlier tariff benchmark | Levelized tariff of ₹4.99/unit under the 2024 investment approval [3] | Could not be confirmed | The later Lower Arun assumption raises the levelized tariff by approximately 14.0% versus the earlier benchmark, alongside a revised completion cost. |
| Project completion cost | ₹7,505.24 Cr approved on 12 August 2025 [1] | Could not be confirmed | This compares with the earlier Lower Arun cost-to-completion approval of ₹5,792.36 Cr [3]; the revised cost is approximately 29.6% higher, so the higher tariff appears partly intended to support the updated capital-cost base. |
| RoE | Project-level RoE or equity IRR could not be confirmed | Project-level RoE or equity IRR could not be confirmed | A tariff figure alone is insufficient to calculate RoE without project equity, financing cost, depreciation, tax, generation, and cash-flow assumptions. |
Sources
- [1]CITIZEN’S CHARTER SJVN LTD. (A joint venture of Govt. of India & Govt. of HP) SJVN Corporate Head Quarters, Shakti — Sjvn, 2026-09-23T00:00:00
- [2]Lower Arun Hydroelectric Project (669 MW) — Sjvn, 2024-11-01T00:00:00
- [3]एसजेवीएन लिलिटेड — Sjvn, 2024-08-02T00:00:00
- [4]SJVN Top Management Inspects Arun-3 Hydroelectric Project Sites in Nepal; Commences Key Infrastructure Works for Lower Arun HEP | SJVN Limited - A Joint Venture of Govt. of India & Govt. of Himachal Pradesh — Sjvn, 2026-11-03T00:00:00