Skip to content
MAJOR CONTRACTS CAPEXPower

SJVN Ltd. announces a new order win

SJVN Ltd.SJVN

TL;DR

The approved total project completion cost for SJVN’s 669 MW Lower Arun Hydro Electric Project is ₹7,505.24 Cr, approved on 12 August 2025. The project feasibility/bidding documentation specifies a 70:30 debt-to-equity funding structure. †Derived from the approved project cost and the disclosed 70:30 ratio. An earlier Cabinet approval had cited ₹5,792.36 Cr as the cost to completion in August 2024. The ₹7,505.24 Cr figure therefore appears to represent the later approved/revised project cost, while the funding structure remained 70:30.

What is the total estimated capital expenditure for the 669 MW Lower Arun Hydro Electric Project, and what is the approved debt-to-equity funding structure disclosed in the company's project feasibility filings?

The approved total project completion cost for SJVN’s 669 MW Lower Arun Hydro Electric Project is ₹7,505.24 Cr, approved on 12 August 2025.[1]

The project feasibility/bidding documentation specifies a 70:30 debt-to-equity funding structure.[2]

†Derived from the approved project cost and the disclosed 70:30 ratio.

An earlier Cabinet approval had cited ₹5,792.36 Cr as the cost to completion in August 2024.[3] The ₹7,505.24 Cr figure therefore appears to represent the later approved/revised project cost, while the funding structure remained 70:30.

Funding sourceShareImplied amount on ₹7,505.24 Cr†
Debt70%₹5,253.67 Cr
Equity30%₹2,251.57 Cr

How does the projected tariff structure and return on equity (RoE) profile for the 669 MW Lower Arun project compare to the company's existing cross-border asset, the 900 MW Arun-3 project, based on the financial assumptions provided in the project feasibility disclosures?

The cited disclosures support a tariff comparison for Lower Arun, but not a quantified RoE comparison with Arun-3. Lower Arun’s latest disclosed assumptions imply a higher tariff than its earlier approval benchmark, while project-level RoE for either asset—and Arun-3’s tariff in the cited material—could not be confirmed.

Lower Arun is planned downstream of Arun-3 and is intended to operate in tandem with it; its annual generation is estimated at approximately 2,901 MU in a 90% dependable year [1]. The tender documentation separately refers to a 70:30 debt-equity structure [2], but that is a financing assumption—not a reported RoE—and it cannot by itself establish returns.

Implication: Lower Arun’s disclosed economics show a revised, higher tariff framework relative to its earlier approval, with the levelized tariff below the first-year tariff. However, the material supplied does not establish whether Lower Arun’s RoE is superior or inferior to Arun-3’s. That conclusion requires the corresponding Arun-3 tariff, project equity, financing, generation, and return assumptions from the feasibility disclosures.

MetricLower Arun, 669 MWArun-3, 900 MWAnalytical read
TariffFirst-year: ₹5.84/unit; levelized: ₹5.69/unit [1]Could not be confirmed from the cited feasibility disclosuresLower Arun’s first-year tariff is ₹0.15/unit, or approximately 2.6%, above its levelized tariff; this indicates some front-loading of tariff recovery.
Earlier tariff benchmarkLevelized tariff of ₹4.99/unit under the 2024 investment approval [3]Could not be confirmedThe later Lower Arun assumption raises the levelized tariff by approximately 14.0% versus the earlier benchmark, alongside a revised completion cost.
Project completion cost₹7,505.24 Cr approved on 12 August 2025 [1]Could not be confirmedThis compares with the earlier Lower Arun cost-to-completion approval of ₹5,792.36 Cr [3]; the revised cost is approximately 29.6% higher, so the higher tariff appears partly intended to support the updated capital-cost base.
RoEProject-level RoE or equity IRR could not be confirmedProject-level RoE or equity IRR could not be confirmedA tariff figure alone is insufficient to calculate RoE without project equity, financing cost, depreciation, tax, generation, and cash-flow assumptions.

Sources

  1. [1]CITIZEN’S CHARTER SJVN LTD. (A joint venture of Govt. of India & Govt. of HP) SJVN Corporate Head Quarters, Shakti — Sjvn, 2026-09-23T00:00:00
  2. [2]Lower Arun Hydroelectric Project (669 MW) — Sjvn, 2024-11-01T00:00:00
  3. [3]एसजेवीएन लिलिटेड — Sjvn, 2024-08-02T00:00:00
  4. [4]SJVN Top Management Inspects Arun-3 Hydroelectric Project Sites in Nepal; Commences Key Infrastructure Works for Lower Arun HEP | SJVN Limited - A Joint Venture of Govt. of India & Govt. of Himachal Pradesh — Sjvn, 2026-11-03T00:00:00